Project is set to carry out improvement works at Tsuen Tsing Interchange (TTI). The works comprise:
A
Construction of a traffic lane of about 300 metres (m) in length to allow exclusive left-turning traffic movement from the down ramp of Tsuen Wan Road westbound (Tuen Mun bound) to Tsing Tsuen Road (Tsing Yi bound).
B
Construction of a single-lane vehicular bridge of approximately 90 m in length and associated slip road of approximately 210 m in length at Texaco Road (westbound) to connect to an existing vehicular bridge section above TTI towards Tsing Yi which has yet to be opened to traffic.
C
Construction of a single-lane slip road of approximately 80 m in length connecting the down ramp of Tsuen Wan Road eastbound (Kowloon bound) to Texaco Road (Ma Tau Pa Road bound).
D
Widening a section of Texaco Road (eastbound) of about 100 m in length north of TTI.
E
Widening part of the roundabout at TTI and improving its junctions.
HyD consulted the Traffic and Transport Committee (the Committee) of the Tsuen Wan District Council and the Kwai Tsing District Council respectively on the project in February 2021. Both Committees supported the project.
The scheme and plan of the project were gazetted under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) on 16 and 23 April 2021. No objection was received during the statutory period and the project was thus authorised accordingly. The relevant authorisation notice was gazetted on 23 and 30 July 2021.
The scheme and plan of the project were gazetted under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) on 16 and 23 April 2021. No objection was received during the statutory period and the project was thus authorised accordingly. The relevant authorisation notice was gazetted on 23 and 30 July 2021.